So! We finally figured out how to tackle the floor downstairs. After much researching and planning here is how we will do it:
  1. Cover the floor with a damp-proof membrane (essentially a thick plastic sheet)
  2. Lay out wooden joists with 30cm gaps in between, making sure they are level (easier said than done as the concrete underfloor is very uneven.)
  3. Insert foam insulation boards in between the gaps left by the joists.
  4. Put down tongue & groove chipboard flooring and screw into joists.
  5. Cover the chipboard floor with a thin foam underlay (approx. 3mm thick)
  6. Install the hardwood engineered tongue & groove floorboards as a 'floating' floor, e.g. the boards are glued to each other along each groove but are not fixed to the sub floor construction.
Of course before any of this work can be done there are a number of prep jobs to be completed, such as installing radiators and connecting them to the heating loop. Luckily our resident plumber worked very hard over the past two weeks to get this job done, and then proceeded with the floor in the living room. There are also other smaller jobs that have to be done like painting the old radiators, clearing the concrete floor of debris so that it won't pierce the damp-proof membrane and of course finding and ordering all the material. These are jobs I can still help with; crawling around on floors and leveling joists is getting a little difficult though. Oh - and documenting the progress of course! ;)

'Where are the pictures already?' I hear you say, so without further ado here they are:

 Tongue & Groove Chipboard
I think we were nearing the maximum load capacity of Alfred with the hardwood flooring. But we managed to transport it all in one go!
 Insulation Boards for kitchen and living room (we have more depth to work with in the kitchen so the insulation there will be double the thickness of the living room - see boards on the right)
 The mess that needs to be cleared before work can start.
The new radiator we bought (all others are the old ones that were in the house - but will be given a new lick of paint).
Laying out the damp-proof membrane
 Smoothed and cut to size
Back to plumbing
 One of the old radiators
 Pipe work into the kitchen
Leak Testing!!
 Finally work begins on the subfloor
 Zooming along
Screwing down the chipboard flooring
 Looking good!
That's how far we got.

Don't get too excited about seeing the finished floor soon though - before we lay that we have to apply the final coat of paint to the walls which also involves some more work on the new door frames we have put in. But I'll let you have a sneak-peak of what it will look like (I had to lay out a few boards as soon as we got them I was so excited!)

 That's all for now - have a good week!

Monday, 6 September 2010

Summerbreak is over!

Hello everyone and apologies for the long hiatus from blogging. We had a bit of a summer break although not in the form of a holiday as you might expect. It still felt like a holiday to us though, because we 'only' worked at work (saving up money for the next building phase - the downstairs floor and kitchen) and not on the house. Which meant that we actually had a few weekends off in which to visit friends and explore our new neighborhood.

However before I get into the new projects that lie ahead for the fall I have a bit of catching up to do and a few DIY-Superheroes to introduce! First up we have (drumroll please):

Mighty Marei - mighty patient that is, which is a good thing when you have joined the illustrious club of stairmasters and spent hours sanding the corners of each step trying to remove the most stubborn paint I have ever had the pleasure of meeting! The combined effort on the stairs of Esther, Marei and myself justify the stairs to be henceforth known as the 'Ladies Stairs' I think. ;o)

I regret to say that I do not have a picture of her working - so you'll just have to take my word for it that she did a great job. Thank you Marei!

Next to join the Superhero club were (Can I just say how incredibly hard it is to find adjectives that start with J!):

Jolly John and Jaunty Jonathan


Another addition to the Canadian workforce these two were drafted in to remove the floorboards in what is to be the kitchen. No small feat considering the floorboards were nailed into the cinder sub-floor with 2 inch iron nails. Dad being Dad was of course delighted to explore the archaeological possibilities of this floor construction - here is the summary of his musings:
The house was built in the 1930's therefore building material was probably scarce and cheap recyclable alternatives had to be sought. Old railway lines were being replaced with newer modern constructions, so the old coal remnants and railway sleepers could be re-used in the building of social housing (which this house was). I'll leave it to you, dear reader, to investigate the likelihood of this theory. :o)

Here a few pictures of the archaeological dig:
Failing to plan is planning to fail.
Getting stuck in.
Out with the old (through the window into the backyard)
Removing the gazillion nails that refused to come out with the boards (which were softened up by damp and a serious infestation of woodworm).
The bare cinder floor.

I don't have pictures of the other work J&J did, but they fixed our side gate to the garden, ripped up all the weeds from the front path, and sanded down the fresh plaster around the new windows downstairs ready to be painted. And all of this was done after a week of hiking!

Now for the rebuild...to be continued in the next post. ;o)

Thank you to the newest DIY-Superheroes - you did a great job and your help is much appreciated.