Friday, 8 February 2013

Studio Build Update No 2

Hello - sorry for the delayed update. It's been a bit busy round here and that's before we even talk about the studio! As you can see from the pictures below a lot has happened: the walls have been clad, insulated with rockwool, celotex and a fancy silver bubble wrap type material, the final windows have gone in, the frames have been trimmed in cedar, the electrical wires have been pulled in to our specifications, the internal wall has been created, the walls of the small storage room have been clad and the walls of the large room have been finished with chipboard and plasterboard ready for me to wallpaper. The ceiling has been clad in white washed pine cladding, .... Nearly there! We are currently waiting for new floor boards as the batch that was intended for our build was bad, we also need a bit more cedar cladding to finish the front, finally the heatpump and rain gutters will be fitted. At some point we will also have wooden decking in front of the studio, which will really finish off the whole look (and make access easier). So although it is taking longer than anticipated (I guess all builds do?) I should still be in by the end of the month. Fingers crossed. I see many trips to IKEA in my immediate future! 
Tomorrow Meister Max arrives to connect up the studio to the house electricity supply and to fit a fancy track lighting system that should provide ample light for my needs. So by the end of next week there should be a massive transformation from building site to near finished building. Stay tuned!

Have a great weekend, especially those of you that are moving house and starting on your own renovation works. (You know who you are. ;))

Dara xx








 For a while the building looked a bit like a spaceship





 The internal door will be fitted once the flooring is completed.
 I love the extra windows on the left side. They let in the Western light and make use of a gap in the neighbour's foliage.

Saturday, 19 January 2013

Studio Build update

Happy weekend everyone! Not sure how the weather is where you are, but here in England it's cold! We have some snow and it generally really feels like winter. Which is not a bad thing if you don't have to travel anywhere and can enjoy snowball fights with your neighbours. ;)

So I bet you've been dyeing to know how the build has progressed this week. The answer is: brilliantly! The builders worked really hard despite the cold and managed to get the roof on just as snow was beginning to fall. It is incredible to see the progress that has taken place in just four days. And the best part is that the only 'work' I had to do was making tea and coffee to keep them warm. :) See for yourself:


 As always proper tools are the key to a job well done.









Working hard, but...
...found time to make a small snowman on the edge. I named him Erik. :)

 The cedar cladding on the last picture makes it look almost finished.
Of course there is still a lot more to do and I won't quite get away with just making tea. The builders will return sometime next week to finish off the walls (insulating and damp proofing them) and floor as well as pull in cables for the electricity. The roof also needs to be insulated and covered in rubber. Then there are more windows to fit to the back and side of the building as well as cover the other three sides of the studio in spruce cladding. There will be an internal wall and door separating the storage room from my work room. Once the builders have left I will have to put up wallpaper on the walls of the studio, connect plug sockets and then work with Paul and our electrician of choice 'Meister Max' to hook up the studio to the main electricity from the house. We are also installing lighting that will be bright enough for me to work at night. Once all of that is completed there is then the small matter of moving all my stuff over. This will involve actually finding where I have hidden my stuff for the past few years, planning sufficient storage, making up a new pattern cutting table, and sorting through stuff before I bring it in! Phew, and I am planning to have all this done by mid - end February. One lives in hope. 

Dara x

Monday, 14 January 2013

Spot the difference


Hmm, the lower picture looks strangely familiar. BUT it's not old, what it covers are the materials for the garden studio!! The upper picture covered this. Ok, so we are a little behind schedule due to some delays on other projects the building company is working on, but the next few days should really see the structure go up. All that was done last week were the foundation stones that the building will rest on. Of course measuring and positioning them took a while and I am glad that the building team took care doing it. 'Measure twice, cut once' as the saying goes. With all the material having been delivered today I am very excited to see how much work the guys can get through in one day. Stay tuned to see if they earn their Superhero credentials. ;)

Plotting
 Measuring and double checking
Foundation stone. These are cemented into the ground about half a meter deep.
Foundation completed.

Very excited! Dara x